ACM MM Workflow

SkillProductivity

This skill helps your AI plan and track the full calendar for an ACM Multimedia paper campaign, from picking a thematic area and track all the way to the final presentation. Once added, your AI can lay out each stage of the cycle, including the April OpenReview submissions, the June anonymous rebuttal, the July decision, and the August camera-ready, so your work stays on schedule.

Available today. Use it from your connected AI after setup.

After adding it, ask your AI to plan your ACM Multimedia campaign and it will build the calendar for you. Keep using it to track progress as each milestone approaches.

Then ask your AI: use the ACM MM Workflow skill

What your AI can do with it

  • Scope thematic areas and choose a submission track
  • Plan the April OpenReview abstract, paper, and supplement deadlines
  • Prepare for the June anonymous rebuttal window
  • Track the July decision and the August camera-ready work
  • Map the schedule out to the November presentation

What this skill tells your AI

The instructions your AI receives, as published by brycewang-stanford/awesome-journal-skills in ACM-MM-Skills/skills/acmmm-workflow/SKILL.md and read by ahel’s review.

Use this to run an ACM Multimedia submission as a scheduled campaign rather than a deadline scramble. The SIGMM calendar has a long gap between the April submission chain and the July decision, so the work clusters at the front and the back.

The ACM MM calendar (2026 anchors, AoE)

Phase2026 dateWhat must be trueSkill
Scope + track choicepre-MarchContribution is cross-modal; thematic area and track chosenacmmm-topic-selection
Draft + evidenceMarchFirst page leads with the multimedia claim; ablations plannedacmmm-writing-style, acmmm-experiments
AbstractMar 25Abstract registered in OpenReviewacmmm-submission
PaperApr 16–8 sigconf pages, anonymous, final PDFacmmm-submission
SupplementApr 8Media/appendix package, anonymous, playsacmmm-supplementary
Rebuttal~Jun 4Anonymous response, small confirmatory resultsacmmm-author-response
Notification~early JulDecision + tieracmmm-review-process
Camera-ready~Aug 6De-anonymized ACM version, artifact releasedacmmm-camera-ready
ConferenceNov 10–14Registered; media-ready talk/posteracmmm-camera-ready

Treat these dates as the 2026 snapshot; reopen the current site each cycle. Note the 2026 notification date was listed inconsistently (July 7 on the CFP vs. July 9 elsewhere).

Front-loaded work (before April)

The April chain is unforgiving because three deadlines land in eight days. Do the slow work early:

  • Lock the thematic area and track — they set format and blinding, and switching late is expensive.
  • Build the cross-modal evidence: matched baselines and the leave-one-modality-out ablation that proves the fusion matters.
  • Plan any user study now; recruiting raters cannot be done in the final week.
  • Draft so the first page already leads with the multimedia contribution.

The three-deadline sprint

T-14d: freeze claims; media assets rendering from scripts
T-7d:  body fits 6-8 sigconf pages; references on overflow pages only
Mar 25: abstract registered (do not miss the earliest deadline)
Apr 1:  paper PDF final, anonymous, metadata-clean
Apr 8:  supplement packaged, anonymous, media plays for a stranger

The long gap and the rebuttal

Between April and June, prepare the confirmatory experiments a reviewer is likely to ask for (the missing baseline, the extra ablation) so the June rebuttal is a matter of reporting results, not scrambling to run them.

Back end (July–November)

  • On acceptance, de-anonymize, complete ACM rights/CCS, and release the public artifact.
  • Register early and plan travel to Rio; visas and international logistics are the usual failure.
  • Build a presentation that plays the media — the seam between modalities should be seen/heard, not just described.
  • On rejection, use the reviews to re-target: MM Asia, ICMR, a workshop, or next year's MM.

Risk register

RiskWhere it bitesMitigation
Missing the abstract deadlineMar 25 forecloses the paperRegister the abstract days early
Wrong track blindingDesk rejectConfirm the track call before formatting
Fusion not shown to matterReviews / rebuttalRun the leave-one-modality-out ablation pre-submission
User study not recruited in timePerceptual claim unbackedStart recruiting before April
Broken anonymous media linkLost evidence in reviewTest the mirror from a clean machine
Rio travel/visa delayCannot presentStart visa paperwork at acceptance

Re-targeting after a rejection

An ACM MM rejection is not the end of the work. Match the reviews to the next move: a retrieval-leaning paper can go to ICMR; a systems-leaning one to MMSys; a regionally scoped or earlier-stage result to ACM Multimedia Asia or a workshop; a matured version to the ACM TOMM journal or next year's ACM MM. Fix the decisive critique — usually the cross-modal-significance one — before resubmitting anywhere.

Output format

[Current phase] <scope/draft/abstract/paper/supplement/rebuttal/decision/camera-ready/conference>
[On track?] yes / at-risk: <what slips>
[Next deadline] <date + deliverable>
[Active skill] <which skill to run now>
[Risks] <ordered>

Signals

GitHub stars
1k
Forks
146
Last commit
Aug 2026
Advanced
Catalog kind
skill
Gateway key
acmmm-workflow
Source
github.com/brycewang-stanford/awesome-journal-skills