\"biz-lean-six-sigma\"

SkillAI & models

This skill equips your AI with Lean and Six Sigma methods for improving how work gets done. Once added, it can help you cut waste, reduce variation, and make slow or inconsistent processes run more smoothly.

Available today. Use it from your connected AI after setup.

After adding the skill, describe the process you want to improve, for example one that feels too slow. Your AI will start looking for waste and ways to streamline it.

Then ask your AI: use the \"biz-lean-six-sigma\" skill

What your AI can do with it

  • Identify the seven wastes (TIMWOOD) in a workflow
  • Run DMAIC improvement projects step by step
  • Apply Lean and Six Sigma principles to reduce process variation
  • Spot steps in a process that waste time or effort
  • Suggest ways to streamline workflows and improve operational efficiency

What this skill tells your AI

The instructions your AI receives, as published by charlieviettq/awesome-agent-skill in .claude/skills/biz-lean-six-sigma/SKILL.md and read by ahel’s review.

Overview

Lean eliminates waste (non-value-adding activities). Six Sigma reduces variation (defects and inconsistency). Combined, they improve speed AND quality. Lean answers "are we doing unnecessary things?" Six Sigma answers "are we doing necessary things consistently?"

Framework

IRON LAW: Value Is Defined by the CUSTOMER, Not the Producer

An activity adds value ONLY if: (1) the customer is willing to pay for it,
(2) it transforms the product/service, AND (3) it's done right the first time.
If any condition fails, the activity is waste — eliminate or minimize it.

The Seven Wastes (TIMWOOD)

WasteDefinitionExample
TransportationUnnecessary movement of materialsMoving inventory between warehouses
InventoryExcess stock beyond immediate need6 months of raw materials sitting idle
MotionUnnecessary movement of peopleWalking across factory floor to get tools
WaitingIdle time between process stepsOrders waiting for approval
Over-productionMaking more than neededPrinting 1000 reports when 100 are read
Over-processingMore work than the customer requiresTriple-checking a non-critical form
DefectsOutput that requires rework or disposalSoftware bugs, manufacturing rejects

DMAIC Improvement Cycle (Six Sigma)

  1. Define: What is the problem? Who is the customer? What is the target metric?
  2. Measure: What is the current performance? Collect data on defect rate, cycle time, variation.
  3. Analyze: What causes the problem? Use root cause analysis (5 Whys, fishbone diagram, Pareto chart).
  4. Improve: What changes will fix it? Design and test solutions.
  5. Control: How to sustain the improvement? Implement monitoring, SOPs, control charts.

Kaizen (Continuous Improvement)

Small, incremental improvements made continuously by frontline workers:

  • Daily standup to identify one improvement
  • Implement immediately if possible
  • Document and share across teams

Output Format

# Lean Six Sigma Analysis: {Process}

## Current State
- Process: {description}
- Key metric: {defect rate / cycle time / cost}
- Current performance: {baseline data}

## Waste Identification (TIMWOOD)
| Waste Type | Found? | Description | Impact |
|-----------|--------|-------------|--------|
| Transportation | Y/N | {detail} | H/M/L |
| Inventory | Y/N | ... | ... |
| Motion | Y/N | ... | ... |
| Waiting | Y/N | ... | ... |
| Over-production | Y/N | ... | ... |
| Over-processing | Y/N | ... | ... |
| Defects | Y/N | ... | ... |

## Root Cause Analysis
{5 Whys or fishbone diagram for top waste}

## Improvement Plan (DMAIC)
| Phase | Action | Owner | Timeline |
|-------|--------|-------|----------|
| Define | {problem statement} | ... | ... |
| Measure | {data collection plan} | ... | ... |
| Analyze | {root cause method} | ... | ... |
| Improve | {solution} | ... | ... |
| Control | {monitoring plan} | ... | ... |

## Expected Impact
- {metric}: {current} → {target} ({X% improvement})

Examples

Correct Application

Scenario: Lean analysis of a restaurant kitchen order process

  • Waiting waste: Orders wait 8 min for expeditor to batch them → Change to real-time ticket system (saves 6 min/order)
  • Motion waste: Chef walks 15m to reach cold storage per order → Relocate prep station fridge (saves 2 min)
  • Defect waste: 12% order error rate → Implement kitchen display system with visual confirmation (target 3%)
  • Root cause (5 Whys): Errors → handwritten tickets �� poor handwriting → no standardized format �� no digital order system

Incorrect Application

  • Identified "the market is declining" as a waste → Market conditions are external, not process waste. TIMWOOD applies to internal processes only.

Gotchas

  • 8th waste — unused talent: Often added to TIMWOOD. Employees with ideas that aren't heard or skills that aren't utilized.
  • Lean can go too far: Eliminating ALL inventory (zero buffer) creates fragility. Some "waste" is strategic buffer. Balance efficiency with resilience.
  • Six Sigma requires data: Without baseline measurements, you can't calculate improvement. Invest in measurement before jumping to solutions.
  • Cultural resistance: Lean/Six Sigma requires frontline buy-in. Top-down mandates without worker involvement fail.

References

  • For value stream mapping methodology, see references/value-stream-mapping.md
  • For statistical process control (SPC), see references/spc-basics.md

Signals

GitHub stars
26
Forks
9
Last commit
Jul 2026
Advanced
Catalog kind
skill
Gateway key
biz-lean-six-sigma
Source
github.com/charlieviettq/awesome-agent-skill