\"biz-toc\"
SkillProductivityThis skill helps your AI find and fix the bottleneck holding back your team's output. Using the Theory of Constraints method, it pinpoints what limits throughput, works through the Five Focusing Steps to relieve it, and sets up Drum-Buffer-Rope scheduling to keep work moving. Useful when output is stuck and you need to know exactly where and why.
Available today. Use it from your connected AI after setup.
No other account needed.
After adding it, describe the process or team whose output feels stuck. Your AI will look for the bottleneck and suggest where to focus first.
Then ask your AI: use the \"biz-toc\" skill
What your AI can do with it
- Identify the bottleneck limiting your throughput
- Work through the Five Focusing Steps to relieve it
- Set up Drum-Buffer-Rope scheduling to pace work around the constraint
- Optimize a process held back by one limiting step
- Diagnose why output is stuck, even from a vague description
What this skill tells your AI
The instructions your AI receives, as published by charlieviettq/awesome-agent-skill in .claude/skills/biz-toc/SKILL.md and read by ahel’s review.
Overview
TOC asserts that every system has at least one constraint (bottleneck) that limits total throughput. Improving non-bottleneck processes does NOT improve system output �� only improving the bottleneck does. The Five Focusing Steps provide a systematic method to find and manage constraints.
Framework
IRON LAW: The System Is Only as Strong as Its Weakest Link
Improving a non-bottleneck process is a WASTE of resources — it produces
more work-in-progress that piles up at the bottleneck. Before optimizing
any process, verify it IS the bottleneck. If it's not, stop.
The Five Focusing Steps
- IDENTIFY the constraint — Find the bottleneck (highest utilization, longest queue, most WIP accumulation)
- EXPLOIT the constraint — Maximize throughput at the bottleneck without adding resources (reduce downtime, eliminate waste at this step, ensure it never starves for input)
- SUBORDINATE everything else — Pace all other processes to the bottleneck's rhythm. Non-bottlenecks should NOT run at full capacity.
- ELEVATE the constraint — If exploitation isn't enough, invest to increase bottleneck capacity (add equipment, hire, outsource)
- REPEAT — After elevating, the constraint may shift to another process. Go back to Step 1.
Drum-Buffer-Rope (DBR) Scheduling
| Element | What It Is | Purpose |
|---|---|---|
| Drum | The bottleneck's pace | Sets the rhythm for the entire system |
| Buffer | Time buffer before the bottleneck | Ensures the bottleneck never starves for work |
| Rope | Signal to release work at the start | Controls WIP by tying input rate to bottleneck pace |
Throughput Accounting (TOC Financial Metrics)
| Metric | Definition |
|---|---|
| Throughput (T) | Revenue - Truly Variable Costs (materials only) |
| Investment (I) | Money tied up in the system (inventory, equipment) |
| Operating Expense (OE) | All other costs to run the system |
| Net Profit | T - OE |
| ROI | (T - OE) / I |
Output Format
# TOC Analysis: {System/Process}
## System Map
{Process A} → {Process B} → {**Process C (bottleneck)**} → {Process D} → Output
## Constraint Identification
- Bottleneck: {process step}
- Evidence: {utilization %, queue length, WIP accumulation}
- Current throughput: {units/period}
## Five Focusing Steps
| Step | Action | Expected Impact |
|------|--------|----------------|
| 1. Identify | {bottleneck location} | — |
| 2. Exploit | {optimize without investment} | +X% throughput |
| 3. Subordinate | {pace other processes} | Reduce WIP by X% |
| 4. Elevate | {investment if needed} | +X% throughput |
| 5. Repeat | {new constraint location} | — |
## DBR Implementation
- Drum: {bottleneck pace = X units/hour}
- Buffer: {X hours of WIP before bottleneck}
- Rope: {release new work every X minutes}
Examples
Correct Application
Scenario: TOC for a PCB assembly line (5 stations)
- Station throughput: Solder Paste (100/hr) → Pick & Place (80/hr) → Reflow Oven (50/hr) → Inspection (90/hr) → Packaging (120/hr)
- Bottleneck: Reflow Oven (50/hr) — lowest throughput, highest utilization
- Exploit: Reduce oven changeover time from 30 min to 10 min → effective capacity +15%
- Subordinate: Slow Pick & Place to 55/hr (don't overproduce WIP before oven)
- Elevate: If needed, add second reflow oven → double capacity
Incorrect Application
- Bought a faster Pick & Place machine (80→120/hr) → System throughput unchanged because Reflow Oven (50/hr) is still the bottleneck. Wasted investment. Violates Iron Law.
Gotchas
- Constraints can be non-physical: Market demand, policy, or management attention can be the real constraint. If the factory can produce 1000 but only sells 500, the market is the constraint.
- Moving bottleneck: After elevating one constraint, the bottleneck shifts. Teams often celebrate and forget Step 5 (Repeat).
- Subordination is counterintuitive: Running non-bottleneck machines at less than full capacity feels wasteful. It's not — overproduction at non-bottlenecks creates WIP that clogs the system.
- TOC vs Lean: Lean eliminates waste everywhere. TOC focuses only on the constraint. They complement each other: use TOC to find WHERE to focus, Lean to optimize HOW.
References
- For Drum-Buffer-Rope implementation details, see
references/dbr-scheduling.md
Signals
- GitHub stars
- 26
- Forks
- 9
- Last commit
- Jul 2026
Advanced
- Catalog kind
- skill
- Gateway key
biz-toc- Source
- github.com/charlieviettq/awesome-agent-skill