CCS Workflow

SkillCommunication

Use when planning an ACM CCS project timeline across the two HotCRP review cycles, from venue fit through abstract registration, full-paper upload, rebuttal, notification, revision, artifact evaluation, ACM camera-ready, and in-person presentation, with backward-planning offsets and the security big-four deadline-hopping calendar.

Available today. Use it from your connected AI after setup.

Connect ahel once, and every AI you use reads what you have installed.

Then ask your AI: use the CCS Workflow skill

What this skill tells your AI

The instructions your AI receives, as published by brycewang-stanford/awesome-journal-skills in ACM-CCS-Skills/skills/ccs-workflow/SKILL.md and read by ahel’s review.

Use this as the project-management skill for a CCS submission. CCS is a conference, not a journal: it has no editor-in-chief and no article-processing charge. The rotating leadership is the per-edition General Chairs and Program Co-Chairs (CCS 2026 Program Co-Chairs: Véronique Cortier and Zhiqiang Lin, reported 2026-07-08; verify against the organizing-committee page). Replace every date below with the current cycle's HotCRP deadlines and work backward.

The dual-deadline cycle

CCS runs two review cycles per year into one conference. A paper enters one cycle only; work rejected in the first cycle may not be resubmitted (even revised) to the second cycle of the same year. Pick the cycle from readiness, not hope — a thin first-cycle submission burns the year at this venue.

  • CCS 2026 (The Hague, Netherlands, Nov 15-19, 2026) Cycle A: abstract registration Jan 7, full paper Jan 14, rebuttal Mar 17-20, notification Apr 9, 2026 (verify).
  • CCS 2026 Cycle B: abstract registration Apr 22, full paper Apr 29, rebuttal Jun 29-Jul 1, notification Jul 17, 2026 (verify). Camera-ready reported Aug 21, 2026.
  • Both 2026 deadlines have passed as of 2026-07-08; treat them as a template and read the CCS 2027 CFP when posted (CCS 2027 host city was still under steering-committee selection).

Milestones

  • Venue fit: confirm the contribution is a broad security result for the SIGSAC PC.
  • Evidence lock: freeze threat model, attack/defense implementation, adaptive evaluation, measurement validation, and the ethics/disclosure posture.
  • Abstract registration: mandatory title, authors, abstract, and topics in HotCRP before the registration deadline; no paper without a registered abstract.
  • Full-paper deadline: upload the anonymized 12-page ACM sigconf PDF plus appendices.
  • Rebuttal window: respond to reviews in the short author-response period.
  • Notification: accept, minor revision (revise within the cycle), or reject.
  • Artifact evaluation: submit artifacts after acceptance for ACM badges if you opt in.
  • Camera-ready and registration: ACM proceedings version, then in-person presentation.

Backward plan from the full-paper deadline

Weeks out (heuristic)Attack-plus-defense milestone
10+Threat model frozen, attack primitive working end to end
8Defense implemented; adaptive attacker designed against it
6Measurement or evaluation runs complete, environment logged
4Ethics and responsible-disclosure section drafted, disclosure initiated
3Full draft in ACM sigconf two-column format
2Internal red-team read by an adversarial-minded colleague
1Anonymity sweep, artifact-availability statement, appendix assembly
0Abstract registered, then full paper in HotCRP

Anchor every offset to the current cycle, never to a past calendar.

Big-four deadline-hopping

CCS, IEEE S&P, USENIX Security, and NDSS run rolling multi-cycle deadlines, so a paper rejected in one can often be reworked into the next open venue within weeks. Keep a live map: a CCS Cycle A reject in April can target USENIX Security or the next NDSS cycle rather than waiting a year. Never resubmit unchanged — reviewers rotate across all four venues.

Coordination notes

  • Assign one owner for the ethics/disclosure section and another for the anonymity sweep; shared ownership is how both slip.
  • Archive the exact submitted PDF and appendices, since rebuttal replies must quote them.

Output format

[Current stage] idea / building / writing / abstract / submission / rebuttal / accepted / artifact
[Cycle] A / B and next official deadline (date + source, or unknown)
[Critical path] <three tasks that determine readiness>
[Risk register] <threat-model / anonymity / ethics / evidence / artifact / presentation>
[Owner map] <task -> person or role>

Signals

GitHub stars
1k
Forks
146
Last commit
Aug 2026
Advanced
Catalog kind
skill
Gateway key
ccs-workflow
Source
github.com/brycewang-stanford/awesome-journal-skills