Changeover Optimizer
SkillDev toolsSetup and changeover time reduction skill with SMED methodology and sequence optimization
Instructions available. Your AI can read the instructions. Execution depends on the setup they require.
Account requirements not reviewed. Check the skill instructions before use; ahel provides instructions and does not run this skill.
Add ahel to your AI once: Claude, ChatGPT, Cursor, Claude Code or Codex. Then ask it to use this.
Then ask your AI: use the Changeover Optimizer skill
What this skill tells your AI
The instructions your AI receives, as published by a5c-ai/babysitter in library/specializations/domains/business/operations/skills/changeover-optimizer/SKILL.md and read by ahel’s review.
Overview
The Changeover Optimizer skill provides comprehensive capabilities for reducing setup and changeover times. It supports SMED (Single-Minute Exchange of Die) methodology, sequence optimization, and changeover time tracking.
Capabilities
- Internal/external setup separation
- Changeover video analysis
- Parallel task identification
- Standardization opportunities
- Quick-release mechanisms
- Sequence optimization
- Changeover matrix
- Time reduction tracking
Used By Processes
- LEAN-004: Kanban System Design
- CAP-002: Production Scheduling Optimization
- LEAN-003: Kaizen Event Facilitation
Tools and Libraries
- Video analysis tools
- SMED templates
- Time study software
- Scheduling optimization
Usage
skill: changeover-optimizer
inputs:
equipment: "Injection Molding Press 5"
current_changeover_time: 120 # minutes
target_changeover_time: 30
changeover_data:
video_analysis: "changeover_video_url"
task_breakdown:
- task: "Remove old mold"
time: 15
type: "internal"
- task: "Get new mold from storage"
time: 20
type: "internal"
- task: "Install new mold"
time: 25
type: "internal"
- task: "Connect utilities"
time: 15
type: "internal"
- task: "Adjust parameters"
time: 25
type: "internal"
- task: "Run test shots"
time: 20
type: "internal"
outputs:
- current_state_analysis
- internal_external_separation
- improvement_opportunities
- optimized_procedure
- changeover_matrix
- implementation_plan
SMED Methodology
Stage 1: Separate Internal and External Setup
| Type | Definition | Goal |
|---|---|---|
| Internal | Must stop machine | Minimize |
| External | Machine running | Maximize |
Stage 2: Convert Internal to External
- Pre-stage tools and materials
- Pre-heat/pre-cool components
- Prepare documentation
- Pre-adjust settings
Stage 3: Streamline All Operations
- Parallel tasks (multiple operators)
- Eliminate adjustments
- Standardize procedures
- Use quick-release mechanisms
Changeover Analysis
Current State:
- Total time: 120 minutes
- Internal: 100 minutes
- External: 20 minutes
Improvement Opportunities:
1. Move mold retrieval to external: -20 min
2. Pre-heat mold: -10 min
3. Use quick-clamps: -15 min
4. Parallel connection work: -10 min
5. Eliminate test shots: -15 min
Target State:
- Total time: 30 minutes
- Internal: 25 minutes
- External: 35 minutes
Changeover Matrix
| From / To | Product A | Product B | Product C |
|---|---|---|---|
| Product A | - | 30 min | 45 min |
| Product B | 35 min | - | 25 min |
| Product C | 40 min | 30 min | - |
Quick Changeover Techniques
| Technique | Application |
|---|---|
| Quick-release clamps | Replace bolts |
| Intermediate jigs | Pre-positioned tooling |
| Color coding | Visual identification |
| One-turn fasteners | Reduce turns required |
| Standardized heights | Eliminate adjustments |
| Preset gauges | Eliminate measurement |
Implementation Steps
- Document current state (video)
- Separate internal/external
- Convert internal to external
- Streamline internal setup
- Streamline external setup
- Standardize and train
- Track and improve
Integration Points
- Production scheduling systems
- Video analysis tools
- Training platforms
- OEE tracking systems
Signals
- GitHub stars
- 2k
- Forks
- 112
- Last commit
- Sep 2026
Advanced
- Item type
- skill
- Key
changeover-optimizer- Source
- github.com/a5c-ai/babysitter