Safe Deploy Pipeline v2

SkillCloud & infra

Use when setting up deployment infrastructure or enforcing a gated release path. Routes to deploy gates, setup, or rollback based on the current deployment stage.

Available today. Use it from your connected AI after setup.

Connect ahel once, and every AI you use reads what you have installed.

Then ask your AI: use the Safe Deploy Pipeline v2 skill

What this skill tells your AI

The instructions your AI receives, as published by tody-agent/codymaster in skills/cm-safe-deploy/SKILL.md and read by ahel’s review.

TL;DR

  • Use before/during staging or production deployment
  • Model: gated deploy pipeline with hard stops
  • Decision: choose setup, active gate execution, or rollback
  • Next: cm-quality-gate for verification evidence

The Iron Law

NO DEPLOY WITHOUT PASSING ALL GATES.
GATES ARE SEQUENTIAL.
IF A GATE FAILS, FIX FIRST.

When to Use

  • Establishing deploy infrastructure for a new project
  • Hardening an existing project that deploys without gates
  • Recovering after incidents caused by weak release validation
  • Running or reviewing a release pipeline before production changes

Choose Your Path

Need to create deploy infrastructure for a project?
└─ YES → Setup path

Already have infrastructure and need to run or review gates?
└─ YES → Gate path

Did a deploy fail or need reversal?
└─ YES → Rollback path
PathSummaryLoad
SetupEstablish scripts, tests, and deploy workflowreferences/setup-new-project.md
Gate 0Secret hygienereferences/gate-0-secret-hygiene.md
Gate 0.5Security scanningreferences/gate-0-5-security-scan.md
Gate 1Syntax validationreferences/gate-1-syntax.md
Gate 2Test suitereferences/gate-2-test-suite.md
Gate 3i18n parityreferences/gate-3-i18n.md
Gates 4-5Build + dist verificationreferences/gate-4-5-build-dist.md
Gate 6Deploy + smoke verificationreferences/gate-6-deploy-smoke.md
RollbackRecovery and reversalreferences/rollback.md

Gate Map

0   Secret hygiene
0.5 Security scan
1   Syntax
2   Test suite
3   i18n parity
4   Build verification
5   Dist verification
6   Deploy + smoke test

Load Rules

  • Load only the gate reference for the current stage.
  • Load setup-new-project.md only when establishing infrastructure.
  • Load rollback.md only when deployment fails or rollback planning is required.

Integration

SkillWhy
cm-quality-gateverification and evidence checks
cm-identity-guarddeploy identity verification
cm-safe-i18ni18n-specific gate setup
cm-terminalmonitored execution of gate commands

Rules

  • Gates are sequential and blocking.
  • Do not skip to later gates when an earlier gate fails.
  • Keep deploy setup and active deploy execution separate in your head and in your prompts.
  • Security and secret hygiene remain part of this skill; do not rely on deprecated skills.

The Bottom Line

Choose setup, the current gate, or rollback. Load only that path, and stop on failure.

Signals

GitHub stars
52
Forks
23
Last commit
Aug 2026
Advanced
Catalog kind
skill
Gateway key
cm-safe-deploy
Source
github.com/tody-agent/codymaster