Safe Deploy Pipeline v2
SkillCloud & infraUse when setting up deployment infrastructure or enforcing a gated release path. Routes to deploy gates, setup, or rollback based on the current deployment stage.
Available today. Use it from your connected AI after setup.
No other account needed.
Connect ahel once, and every AI you use reads what you have installed.
Then ask your AI: use the Safe Deploy Pipeline v2 skill
What this skill tells your AI
The instructions your AI receives, as published by tody-agent/codymaster in skills/cm-safe-deploy/SKILL.md and read by ahel’s review.
TL;DR
- Use before/during staging or production deployment
- Model: gated deploy pipeline with hard stops
- Decision: choose setup, active gate execution, or rollback
- Next:
cm-quality-gatefor verification evidence
The Iron Law
NO DEPLOY WITHOUT PASSING ALL GATES.
GATES ARE SEQUENTIAL.
IF A GATE FAILS, FIX FIRST.
When to Use
- Establishing deploy infrastructure for a new project
- Hardening an existing project that deploys without gates
- Recovering after incidents caused by weak release validation
- Running or reviewing a release pipeline before production changes
Choose Your Path
Need to create deploy infrastructure for a project?
└─ YES → Setup path
Already have infrastructure and need to run or review gates?
└─ YES → Gate path
Did a deploy fail or need reversal?
└─ YES → Rollback path
| Path | Summary | Load |
|---|---|---|
| Setup | Establish scripts, tests, and deploy workflow | references/setup-new-project.md |
| Gate 0 | Secret hygiene | references/gate-0-secret-hygiene.md |
| Gate 0.5 | Security scanning | references/gate-0-5-security-scan.md |
| Gate 1 | Syntax validation | references/gate-1-syntax.md |
| Gate 2 | Test suite | references/gate-2-test-suite.md |
| Gate 3 | i18n parity | references/gate-3-i18n.md |
| Gates 4-5 | Build + dist verification | references/gate-4-5-build-dist.md |
| Gate 6 | Deploy + smoke verification | references/gate-6-deploy-smoke.md |
| Rollback | Recovery and reversal | references/rollback.md |
Gate Map
0 Secret hygiene
0.5 Security scan
1 Syntax
2 Test suite
3 i18n parity
4 Build verification
5 Dist verification
6 Deploy + smoke test
Load Rules
- Load only the gate reference for the current stage.
- Load
setup-new-project.mdonly when establishing infrastructure. - Load
rollback.mdonly when deployment fails or rollback planning is required.
Integration
| Skill | Why |
|---|---|
cm-quality-gate | verification and evidence checks |
cm-identity-guard | deploy identity verification |
cm-safe-i18n | i18n-specific gate setup |
cm-terminal | monitored execution of gate commands |
Rules
- Gates are sequential and blocking.
- Do not skip to later gates when an earlier gate fails.
- Keep deploy setup and active deploy execution separate in your head and in your prompts.
- Security and secret hygiene remain part of this skill; do not rely on deprecated skills.
The Bottom Line
Choose setup, the current gate, or rollback. Load only that path, and stop on failure.
Signals
- GitHub stars
- 52
- Forks
- 23
- Last commit
- Aug 2026
Advanced
- Catalog kind
- skill
- Gateway key
cm-safe-deploy- Source
- github.com/tody-agent/codymaster