Control Plan

SkillDev tools

Control Plan, build, review, or audit a Prototype, Pre-launch, or Production Control Plan linked to PFMEA failure modes and controls. Use when creating a new control plan, updating after a process change or corrective action, or auditing an existing CP for completeness and PFMEA alignment. Covers AIAG Control Plan reference manual and IATF 16949 §8.5.1.

Use Control Plan in Claude, ChatGPT or Ahel Desktop

Free. Sign in, add Control Plan and connect your AI. About a minute.

Also: Claude Code · Cursor · Codex

Then ask your AI: use the Control Plan skill

Details

Instructions available. Your AI can read the instructions. Execution depends on the setup they require.

Add Ahel to your AI once: Claude, ChatGPT, Cursor, Claude Code or Codex. Then ask it to use this.

Control PlanStart free

What this skill tells your AI

The instructions your AI receives, as published by hashgraph-online/awesome-codex-plugins in plugins/RBraga01/Quality-Engineering-Skills/skills/planning/control-plan/SKILL.md and read by Ahel’s review.

When to use

Use this skill when:

  • Creating a new Control Plan for prototype, pre-launch, or production
  • Reviewing an existing Control Plan for completeness and accuracy
  • Updating the CP after a process change, corrective action (D7), or PFMEA update
  • Auditing a supplier's Control Plan during qualification or an IATF audit
  • Linking PFMEA controls to the Control Plan after FMEA review

Prerequisites

  • Process Flow Diagram (required — CP must mirror the process flow sequence)
  • PFMEA (required — CP controls derive from PFMEA recommended actions)
  • Drawing with ballooned characteristics and tolerance data
  • List of special and significant characteristics (SC, CC, KPC, KCC)
  • MSA results for measurement systems referenced in the CP (for production CP)

Workflow

Step 1 — Determine the CP type

TypeWhenPurpose
PrototypeDuring prototype buildsDescribes dimensional, material, and functional tests in prototype phase
Pre-launchAfter prototype, before PPAPDescribes controls in place during pilot/pre-production runs
ProductionAfter PPAP approval, at SOPThe living document — updated throughout product life

All three types may coexist during APQP phases. The Production CP is the one submitted as PPAP Element 7.

Step 2 — Build the Control Plan structure

The CP is a table with one row per characteristic per process step. Each row contains:

Header section (document-level):

  • Control Plan number and revision
  • Part number and revision
  • Part name / description
  • Supplier / plant
  • Supplier code (OEM code)
  • Key contact / phone
  • Core team (multi-functional)
  • Date (original) and date (revised)
  • Customer engineering approval (name/date) — if required
  • Customer quality approval (name/date) — if required
  • Supplier approval (name/date)

Detail columns (one row per characteristic):

ColumnWhat to enter
Part/process numberReference number from Process Flow
Process name / operation descriptionName of the process step
Machine, device, jig, or toolEquipment used at this step
NumberCharacteristic number (links to balloon drawing)
Product characteristicProduct feature being controlled (dimension, material property, appearance)
Process characteristicProcess parameter being controlled (temperature, pressure, speed, torque)
Special characteristic classificationSC, CC, KPC, KCC, *, ▲ per customer symbology
Product/process specification / toleranceNominal value and tolerance band
Evaluation / measurement techniqueGauge type, method, or test used
Sample sizeNumber of parts per sample
FrequencyHow often samples are taken (every hour, every lot, 100%)
Control methodHow the process is controlled (SPC chart, go/no-go gauge, visual, 100% inspection)
Reaction planWhat to do if out-of-control or out-of-specification (who, what action, containment)

Step 3 — Populate from PFMEA

For each high-severity failure mode in the PFMEA:

  1. Identify the current prevention and detection controls from the PFMEA
  2. Transfer these controls into the corresponding CP row
  3. The reaction plan must address what happens if the control detects a non-conformance

Every special characteristic (SC, CC, ★, ◆) in the PFMEA must appear in the CP. Every recommended action completed in the PFMEA must be reflected in the updated CP controls.

Step 4 — Special characteristics — mandatory coverage

ClassificationOEM symbolCP requirement
Safety / Regulatory★ SC / ⬟100% inspection OR demonstrated Cpk ≥ 1.67 + statistical monitoring
Critical CharacteristicCC / ◆Same as above — automatic stop if out of spec
Significant CharacteristicSC (Ford) / KPCProcess monitoring with defined sample plan and reaction
Key Control CharacteristicKCCProcess parameter monitoring (not product) — SPC or other control

OEM symbol conventions vary. Always use the exact symbol specified in the customer's CSR:

  • Ford: CC (Critical Characteristic) and SC (Significant Characteristic) — do not use ★ or ◆
  • GM: ★ for safety-critical; Δ for significant
  • VW / Audi: D (design feature, = CC), E (significant characteristic), I (functional dimension) per FORMEL Q
  • BMW: G-SC (significant characteristic), G-CC (critical characteristic) per BMW standard
  • Stellantis: CC and SC per MAQMSR — requires AIAG-VDA FMEA format alignment

Using the wrong symbol for the customer's OEM is an immediate finding at PPAP and IATF audit.

For all special characteristics: the reaction plan must specify who is notified, containment action, and when the process can restart.

Step 5 — Reaction plan requirements

Every row in the CP must have a reaction plan. Minimum requirements:

  • Who is responsible for taking action
  • What immediate containment is applied (tag, sort, hold, stop production)
  • Who is notified (supervisor, quality, engineering)
  • When production may restart (after what verification)
  • Reference to relevant Work Instruction or SOP for the reaction

A reaction plan that says only "notify supervisor" or "quarantine parts" is insufficient — it must specify the next step after notification.

Step 6 — Audit an existing Control Plan

When reviewing a supplier's or internal CP, check:

Structure:

  • All process steps from the Process Flow are represented
  • Each special characteristic has its own dedicated row
  • Revision level matches the current PFMEA and drawing revision

Characteristics:

  • All SC/CC/KPC/KCC are listed with correct classification symbols
  • Product AND process characteristics are both covered (not just product)
  • Tolerances match the current released drawing

Controls:

  • Measurement technique is specific (gauge type, not just "measure")
  • Sample size and frequency are defined (not "as required" or "as needed")
  • 100% inspection is specified where Cpk < 1.33
  • SPC control charts are specified for characteristics where they are required

Reaction plan:

  • Every row has a reaction plan
  • Reaction plans specify concrete actions (not just "notify supervisor")
  • Reaction plans are consistent with PFMEA failure mode severity

Alignment:

  • CP controls match PFMEA current controls column for each failure mode
  • Completed PFMEA recommended actions are reflected in updated controls
  • CP revision date is more recent than most recent PFMEA update date

Validation criteria

A complete Production Control Plan for PPAP submission must:

  • Cover every operation in the Process Flow
  • Include every special and significant characteristic with correct classification
  • Have a MSA-validated measurement system for every variable characteristic on SC/CC
  • Have a reaction plan for every row
  • Be signed by the APQP team (multi-functional) and have customer approval if required
  • Match the PFMEA revision level

Common mistakes

  • Control Plan created without reference to PFMEA — controls are generic, not linked to actual failure modes
  • Reaction plan says "notify supervisor" only — not a reaction plan, just escalation
  • Missing process characteristics — CP only controls product dimensions, not process parameters like temperature or torque
  • Sample plan says "as required" — must specify a number and frequency
  • SC/CC characteristics not identified with correct customer symbol — auditor will flag this immediately
  • CP not updated after D7 of an 8D — the most common disconnect in corrective action systems
  • Gauge type not specified — "visual inspection" or "measure" is not sufficient; must name the tool

Output Format

At the start of each use, ask the user:

"How would you like to receive the output? A — Structured Markdown (formatted tables and sections, ready to copy) B — Plain tables (simplified structure for Excel or Word) C — Narrative report (flowing text for a formal document or email)

Default: A."

Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.

Changelog

VersionDateAuthorChange
1.02026-06-06@RBraga01Initial release
1.12026-06-06@migmccAdded OEM-specific special characteristic symbol conventions (Ford, GM, VW, BMW, Stellantis) in Step 4