Plan Fix

SkillDev tools

Draft and locally commit a tightly scoped, phased fix SPEC from one or more issues with its planning ledgers frozen, then stop before push/PR and hand off to review-plan. Triggers: "plan-fix", "plan a fix for issue N", "draft the fix spec".

Available today. Use it from your connected AI after setup.

Connect ahel once, and every AI you use reads what you have installed.

Then ask your AI: use the Plan Fix skill

What this skill tells your AI

The instructions your AI receives, as published by gtrabanco/agentic-workflow in skills/plan-fix/SKILL.md and read by ahel’s review.

Fix-flow counterpart of plan-feature: draft the SPEC plus frozen acceptance and the two planning ledgers, then stop. review-plan reviews the plan in a clean context; only after its PASS does execute-phase --fix implement the phases. A fix unit has no Product half and never grows a fake one — its authority is reproduction, root cause, regression scope, and rollback.

Turn contract — verify before ending the turn

✓ The fix SPEC is committed on its `fix/<n>-<topic>` branch (commit sha pasted) — NOT pushed, NO PR
✓ Both ledgers are frozen in the SPEC, `stage: plan` readiness printed
  `READY-FOR-REVIEW`, and the `artifactRevisionId` of this write is named in the hand-off
✓ This fix has no fabricated Product half, and the hand-off routes to
  `/review-plan` — never straight to `/execute-phase`
✓ The Hand-off block was printed exactly as specified
✓ A multi-issue unit? The hand-off names every issue once as `#primary + #n2 + …`; a single-issue unit names only its issue
✓ Artifact language: explicit user instruction > the project's declared docs language > English. The CONVERSATION language never decides — a Spanish prompt still produces English artifacts unless one of the first two says otherwise
✓ The closing `→ Next:` block is printed as the ABSOLUTE last output

About to end the turn with any box unchecked? The turn is NOT done — complete the missing box first (weak models drop end-of-document duties).

Persona

Senior software architect: skeptical, scope-disciplined and evidence-based. Choose the smallest change set, surface second-order effects, and cite evidence.

Input

One or more GitHub issue numbers from this repo, space-separated.

  • One number: unchanged single-issue behavior (plan-fix 17).
  • Multiple numbers: step 5 decides one capability bundle or homogeneous mechanical batch; different symptoms/files may merge when one outcome, validator and rollback boundary own them.
  • Invalid input: name the bad token and stop; never proceed partially.

Output

  • docs/fix/<primary>-<topic>/SPEC.md — template plus required sections and a ## Phases ledger (always ≥2; final Hardening & PR). Primary is the sole issue number or the lowest merged issue; merged SPECs retain each issue's criteria.
  • docs/fix/<primary-issue-number>-<topic>/ACCEPTANCE.md — the compact frozen finish line from verification-contract, retaining one criterion per issue.
  • ### Planning evidence and ### Obligations inside that SPEC — the two frozen ledgers (planning ledgers), with the fix rows evidence-grounding names: reproduction, root cause with code evidence, regression scope, rollback path, and the affected invariant or use case. A missing reproduction row is unknown with an owner, not "probably this".
  • Branch fix/<primary>-<topic> from main.
  • One local commit with SPEC and docs/fix/README.md (pending, all merged issues).
  • Stop: do not push/open PR. Hand off to review-plan, then execute-phase --fix.

Research and reference trace (plan stage)

  • Conditional web research. Plan-stage research runs only when a bounded question (ROWS.md Q1–Q5) cannot be answered from repository evidence: run exactly one web pass before the phases are emitted and freeze what it returns as evidence rows (URL and access date). A question the repository answers is never re-fetched.
  • Mandatory reference trace. Affected code is located by symbol/reference search — LSP/serena when the environment offers it, grep otherwise — and the blast radius is derived from that search, never from model memory: added or changed code can break callers the plan must name.

Hard rules

  • Honor Workflow conventions: create fix/<n>-<topic> first, never main; gate, docs language and evidence apply. Cite file paths for code and sections for docs; track new problems as separate fix/roadmap entries, never inline.
  • Language precedence: explicit user instruction > declared docs language > English — the conversation language never decides. If the issue body isn't in the artifact language, translate silently; if translation is ambiguous, inconsistent, or nonsensical, ask before committing to a meaning.
  • Never push, never open the PR — that's execute-phase --fix.

Progressive loading — validate before drafting

The allowlist is exactly these five paths:

  1. Every invocation: read planning process and execute its validation and multi-issue gate; a refusal or invalid input stops.
  2. Before a material question or SPEC: read question and SPEC contract.
  3. Any route that can write a fix SPEC: consume the planning preflight (owns the normalized repository state read and the ONE final architectural classification) before drafting.
  4. Before emitting phases: load the phase contract for the 8-box phase-lint and phase fingerprint.
  5. Before commit: consume the verification contract and write the frozen ACCEPTANCE.md.
  6. While drafting: ground per evidence-grounding and freeze both ledgers per pre-execution-review; before the hand-off run evidence-grounding's stage: plan readiness preflight and paste the block. READY-FOR-REVIEW licenses the hand-off; it is never a review verdict, and this skill does not review its own plan.

Resources are normative and one hop from this file. Missing required resource → stop; never approximate fixed blocks or phase rules.

Hand-off

After commit, print exactly:

SPEC drafted: docs/fix/<primary>-<topic>/SPEC.md
Branch: fix/<primary>-<topic> (local, not pushed)
Commit: <short hash>
Issue set: #<primary> + #<n2> + #<n3> (print every issue in this unit; single issue → #<primary>)

→ Next: /review-plan fix-<primary> — an independent context reviews this plan and
  these ledgers before any phase runs; /execute-phase --fix <primary> follows its
  PLAN-REVIEW-PASS (issue set #<primary> + #<n2> + #<n3>)
  · PLAN-REVIEW-FAIL → repair here as one batch, rotate the artifact revision, re-review
  · a product choice is open → /design-feature, then /review-spec, then replan this fix
  · after PASS, explicit atomic mode → /execute-phase --fix <primary> P<n> (same issue set)
  · the final `Hardening & PR` phase pushes and opens the PR with `Closes #<primary>`
    plus one `Closes #<n>` line for every other issue listed in the Issue set
  · scope looks wrong → adjust the SPEC and re-run /plan-fix

Replace every placeholder with the complete actual issue set before printing; never print <n2>, <n3>, or in a live hand-off.

Then end in the user's language with a 2-3 sentence summary: what the SPEC ships, the biggest risk, and any open decisions left for the implementer.

Portability (agents other than Claude Code)

Use explicit fallbacks when a primitive is absent: open named SKILL.md files in a fresh context; run architect-level scoping on the strongest model, then hand implementation to a cheaper worker.

Done when

  • The SPEC and frozen ACCEPTANCE.md follow canonical contracts, surface risks/blockers, register in docs/fix/README.md, and are committed locally on fix/<n>-<topic> (not pushed/no PR). The closing → Next: Hand-off is printed.