pre-phase-review

SkillDev tools

Review PVR, A&D, and Plan before starting a new phase, highlight findings, discuss decisions

Available today. Use it from your connected AI after setup.

Connect ahel once, and every AI you use reads what you have installed.

Then ask your AI: use the pre-phase-review skill

What this skill tells your AI

The instructions your AI receives, as published by the-agency-ai/the-agency in .claude/skills/pre-phase-review/SKILL.md and read by ahel’s review.

Pre-Phase Review

Review the living artifacts (PVR, Architecture & Design, Plan) before starting a new phase. Surface anything that needs attention and get clearance to proceed.

Arguments

  • $ARGUMENTS: Optional next phase description (e.g., "Phase 3: First Cloud Deploy"). If empty, infer from the plan file's next incomplete phase.

Instructions

Step 1: Locate living artifacts

Search for the three artifact types:

  1. PVR — Glob agency/workstreams/*/**/*-pvr-*.md and usr/*/**/*-pvr-*.md for Product Vision & Requirements files.
  2. A&D — Glob agency/workstreams/*/**/*-architecture-*.md, agency/workstreams/*/**/*-ad-*.md, and docs/plans/*-architecture-*.md for Architecture & Design files.
  3. Plan — Glob docs/plans/*.md and pick the most recently modified plan file.

If any artifact is missing, note it ("PVR not found — skipping PVR review") but continue with whatever exists. If none are found, tell the user and stop.

Step 2: Parallel review agents

Launch three agents in parallel, one per artifact:

PVR reviewer:

  • Read the PVR file.
  • Is it still accurate given what has been built so far?
  • Are requirements met, changed, or newly discovered?
  • Are success criteria still valid and measurable?
  • Flag anything that no longer reflects reality.

A&D reviewer:

  • Read the A&D file.
  • Are design decisions still sound given what was learned during implementation?
  • Are there decisions that should be revisited based on new information?
  • Are there new patterns, conventions, or architectural choices made during implementation that should be documented here?
  • Flag any drift between the document and the actual codebase.

Plan reviewer:

  • Read the Plan file.
  • Are remaining phases still correctly scoped given what was learned?
  • Should anything be reordered, split, or merged?
  • Are there new risks, dependencies, or blockers?
  • Does the phase boundary still make sense, or has scope shifted?

Each agent should return a structured list of findings, each categorized as:

  • Clean — no changes needed
  • Highlight — informational, no action required but worth noting
  • Decision needed — requires the principal's input before proceeding

Step 3: Consolidate findings

Merge results from all three agents. Group by category:

  1. No changes needed — list any artifacts that are fully up to date
  2. Highlights (informational) — things worth noting but not blocking
  3. Decisions needed — items requiring the principal's input, each with:
    • What the issue is
    • What the options are
    • Trade-offs for each option
    • A recommendation

Step 4: Present to the principal

Always show the full consolidated report, even if everything is clean.

If no issues were found:

PVR, A&D, and Plan reviewed. No changes needed. Ready to proceed to [next phase].

If there are highlights but no decisions:

Show the highlights, then: "No decisions needed. Ready to proceed to [next phase]."

If decisions are needed:

Show everything, then present each decision with numbered options so the principal can reply by number.

Step 5: Apply decisions

If the principal makes decisions that require artifact updates:

  1. Update the relevant files based on their decisions.
  2. Confirm what was changed in each file.
  3. Do NOT commit — leave changes unstaged for the principal to review.

Step 6: Update handoff

After decisions are applied, locate the handoff file (glob usr/*/*/handoff.md or usr/*/captain/handoff.md). Update with:

  • Pre-phase review findings and decisions made
  • Updated phase scope (if any changes were made)
  • Current state of PVR, A&D, and Plan
  • What the next phase will tackle

Step 7: Get clearance

Ask: "Ready to proceed to [next phase]?"

Wait for explicit confirmation before the phase begins.

Signals

GitHub stars
55
Forks
8
Last commit
Sep 2026
Advanced
Catalog kind
skill
Gateway key
pre-phase-review
Source
github.com/the-agency-ai/the-agency