Use when the project owner wraps or closes a PuPu version/release — \"关 0.1.10\", \"close the release\", \"版本收尾\". Verifies a Size=Release parent issue and its direct sub-issues in GitHub Project, records close evidence there, and hands it to release certification.

Available today. Use it from your connected AI after setup.

Connect ahel once, and every AI you use reads what you have installed.

Then ask your AI: use the Release: Close skill

What this skill tells your AI

The instructions your AI receives, as published by haoxiang-xu/pupu in .claude/skills/release-close-sprint/SKILL.md and read by ahel’s review.

Administrative wrap-up, not deep QA or a substitute for release certification. The only scope is one Size=Release parent and its direct sub-issues in PUPU Project. Do not read or update a sprint document.

Plumbing: follow .claude/skills/release-open-sprint/board-api.md. All decisions, test evidence, waivers, and growth baseline live in GitHub comments on the Release parent or relevant child issue.

Acts

Act 1 — resolve and roll-call. Resolve the explicit open Release parent; zero or multiple matches requires the project owner's choice. Keep it In Progress while you paginate its direct sub-issues. For each child, verify both GitHub issue state=closed and Project Status=Done. A ticket labelled new feature also needs a fresh release-feature-audit:v2 comment naming this parent, Overall=PASS, and a Candidate digest equal to its delivered candidate; a waiver instead needs the full release-audit-waiver:v2 record on both child and parent. Do not accept free-text comments as evidence. A child without a work-type label blocks the roll-call until the project owner classifies it. Do not deep-review implementation here.

For any open child, the project owner chooses one disposition:

  • Must ship: keep it attached; the Release cannot close.
  • Defer: comment ticket, reason, destination, and project owner decision on the parent first; then remove it or attach it to a named future Release.
  • Cancel: record the project owner's decision, remove the child from this Release, and, if requested, close it as not planned. Never use Project Status=Done to represent canceled work.

Never close a parent while it still owns an open child. Only after required scope is complete may the parent move to In Review. A must-ship child or a new must-fix child keeps or returns the parent to In Progress before any scope change.

Act 2 — smoke via real app. Use the test-api skill with a real LLM (convention: openai:gpt-4.1, never local ollama). Cover chat lifecycle, message send, model/toolkit switch, and one probe through every affected area. Delete probe sessions. If Python changed, restart the sidecar before testing.

Act 3 — Playwright on new features. Drive the key user path once for every child labelled new feature. Assert reachability and core interaction, not pixel perfection.

Act 4 — red lights. Post every failure, repro, and disposition in a close record comment on the parent. A must-fix bug becomes a direct child and blocks closure; first return the parent to In Progress. A deferred or accepted-risk bug is created as unparented backlog or a child of a named future Release only after the project owner decides. This skill does not adjudicate GO/NO-GO.

Act 5 — growth baseline. Run the full growth-analyst collection into .claude/archive/growth and post stars, previous-release downloads, 14-day uniques, snapshot date, and links to the snapshot on the Release parent. This is the next Release's before-picture.

Act 6 — certification handoff and close. Post one structured close record on the parent: direct-child roll-call, audit/waiver decisions, smoke and Playwright evidence, red lights, growth baseline, and certification link. The parent remains In Review until it has this structured certification comment:

<!-- release-certification:v1 -->
Candidate digest: sha256:<64 hex>
Evidence: certification report or run link
Verdict: GO | NO-GO | INCOMPLETE | EXCEPTION
Authority: project owner or COO
Approved at: YYYY-MM-DD

Only GO, or an EXCEPTION with project owner/COO authority, permits closure. NO-GO, INCOMPLETE, missing candidate/evidence, or an unapproved exception keeps the parent In Review. On a passing record, close the parent GitHub issue and set Project Status=Done; read back both states before declaring the release closed.

Common mistakes

  • Inferring version scope from Iterations, title, label, or a document instead of direct sub-issues.
  • Treating any audit comment as PASS.
  • Detaching an unfinished child without recording the project owner's decision.
  • Closing a Release parent with open children because GitHub permits it.
  • Treating a red light as a GO/NO-GO decision owned by certification.
  • Using Done to hide canceled or deferred work.