VDA 6.3 Process Audit

SkillDev tools

VDA 6.3 Process Audit, conduct or prepare for a process audit using the VDA 6.3 methodology, evaluate process elements P1, P7, calculate degree of fulfillment, classify findings, and generate an audit report. Use when a customer requests a VDA 6.3 audit, when auditing a supplier's manufacturing process, or when preparing for a VDA process audit visit. Covers VDA 6.3 4th edition (2023).

Use VDA 6.3 Process Audit in Claude, ChatGPT or Ahel Desktop

Free. Sign in, add VDA 6.3 Process Audit and connect your AI. About a minute.

Also: Claude Code · Cursor · Codex

Then ask your AI: use the VDA 6.3 Process Audit skill

Details

Instructions available. Your AI can read the instructions. Execution depends on the setup they require.

Add Ahel to your AI once: Claude, ChatGPT, Cursor, Claude Code or Codex. Then ask it to use this.

VDA 6.3 Process AuditStart free

What this skill tells your AI

The instructions your AI receives, as published by hashgraph-online/awesome-codex-plugins in plugins/RBraga01/Quality-Engineering-Skills/skills/audit/vda-6-3-audit/SKILL.md and read by Ahel’s review.

When to use

Use this skill when:

  • Conducting a VDA 6.3 process audit at a supplier or internally
  • Preparing for an OEM process audit visit (BMW, VW, Audi, Mercedes, Porsche, Stellantis)
  • Auditing a new supplier during qualification
  • Responding to a customer concern by conducting a focused process audit
  • Evaluating a supplier's manufacturing process capability before SOP

Prerequisites

  • Customer audit scope (which process/product to audit)
  • VDA 6.3 question catalogue (the auditor works from the standard questions)
  • Process Flow Diagram, PFMEA, Control Plan, and Work Instructions for the audited process
  • Access to the production area, equipment records, personnel, and quality records

Workflow

Step 1 — VDA 6.3 Structure Overview

VDA 6.3 is organised into 7 process elements (P1–P7):

ElementNameApplies to
P1Potential AnalysisNew suppliers — evaluates readiness before series production
P2Project ManagementAPQP and product/process development process
P3Planning the Product and Process DevelopmentDesign and process planning activities
P4Supplier Management (Purchasing)Sub-supplier control and qualification
P5Process Input / SeriesIncoming materials and components
P6Process Execution / Customer Satisfaction / ServiceThe manufacturing process itself
P7Customer Support / Customer Satisfaction / ServiceDelivery performance, escalation, field support

For a focused series production audit (most common): P5, P6, P7 are mandatory. P1–P4 are added for new supplier qualification or product launch audits.


Step 2 — Rating system

Every question in VDA 6.3 is scored on a 0–10 scale:

ScoreMeaning
10All requirements fulfilled — systematic, effective, and documented evidence exists
8Requirement largely fulfilled — minor gaps, no systematic risk
6Requirement partially fulfilled — deviations exist, limited risk
4Requirement insufficiently fulfilled — significant gaps, risk to quality
2Requirement not fulfilled — systematic failure, high risk
0Not applicable OR not fulfilled with no evidence

A score of 4 or less on any question is a deficiency and must be documented with a finding and corrective action requirement.


Step 3 — Degree of Fulfillment calculation

For each process element:

Element score (%) = (Sum of all question scores) / (Maximum possible score) × 100

Weighting system (critical): Each question in the VDA 6.3 question catalogue has a pre-assigned weighting factor of 1, 2, or 3. These weights are fixed in the standard — the auditor cannot change them. Questions covering safety-critical topics (error-proofing, special characteristics control, non-conformance segregation) typically carry weight 2 or 3. The maximum possible score per question = 10 × weighting factor.

To calculate the degree of fulfillment correctly:

  • Use the official VDA 6.3 question catalogue, which lists each question with its weight
  • Sum (score × weight) for all applicable questions in the element
  • Divide by the sum of (10 × weight) for all applicable questions
  • Do not average raw scores — applying equal weight to all questions is a calculation error that produces incorrect element ratings

If a question is not applicable (N/A), it is excluded from both the numerator and denominator.

VDA 6.3 rating thresholds
Degree of fulfillmentRatingInterpretation
≥ 90%AProcess suitable for series production — no significant concerns
75% – < 90%BConditionally suitable — corrective actions required within agreed timeframe
< 75%CNot suitable — series production release blocked until corrective action complete

A rating of C blocks SOP — the customer will not release the supplier for series production until re-audit achieves at least B.


Step 4 — P6 — Process Execution (the core audit)

P6 is the most extensive element and covers the actual manufacturing process. Key areas:

P6.1 — Process inputs

  • Are incoming materials and components controlled?
  • Are change management procedures in place and effective?
  • Are specifications current and accessible at point of use?

P6.2 — Personnel

  • Are operators qualified and trained for the tasks they perform?
  • Are training records current?
  • Is a qualification matrix maintained and used?

P6.3 — Resources (equipment, tools, gauges)

  • Is equipment maintained per a preventive maintenance plan?
  • Are calibration records current for all measurement equipment?
  • Are work instructions present at every workstation and at the correct revision?

P6.4 — Failure mode prevention (error-proofing)

  • Are poka-yoke devices in place for all High-AP failure modes?
  • Are error-proofing devices checked at the correct frequency?
  • Is the check result documented?

P6.5 — Quality inspections and tests

  • Are incoming inspection, in-process inspection, and final inspection defined and performed?
  • Are inspection records maintained and traceable?
  • Is SPC in place for all special characteristics?

P6.6 — Non-conformance management

  • Is non-conforming material identified, segregated, and controlled?
  • Is there a defined reaction plan for out-of-control conditions?
  • Are non-conformances escalated to quality and documented?

P6.7 — Continuous improvement

  • Are quality KPIs tracked (reject rate, scrap, rework, OEE)?
  • Are improvement actions driven by data?
  • Are lessons learned captured and applied?

Step 5 — Conduct the audit

Pre-audit:

  • Request all relevant documentation: Process Flow, PFMEA, Control Plan, WIs, maintenance records, calibration records, training records
  • Review and identify gaps before the site visit
  • Confirm auditor qualification: VDA 6.3 audits require a trained, qualified auditor — internal auditors must hold a recognised VDA 6.3 auditor qualification (VDA QMC certification or OEM-equivalent). An unqualified person conducting the audit invalidates the result.
  • Confirm auditor independence: the auditor must not have direct responsibility for the process being audited. Self-assessment by the process owner is not a substitute for an independent audit.

Opening meeting:

  • Confirm scope, timing, and audit plan
  • Introduce audit team and request the process owner to accompany

Process walk (the audit):

  • Follow the process flow physically — start from incoming material, end at shipment
  • For each step: observe, ask, verify records
  • Ask: "Show me the record for this" — never accept verbal confirmation
  • Score each question in real time; document evidence (positive and negative)

Findings classification:

  • Score 6: Partial fulfilment — finding documented, corrective action required; deadline typically 90 days
  • Score 4: Insufficient fulfilment — significant gap, represents active risk to quality; escalate deadline; customer OEMs often treat score-4 findings on critical questions (P6.4, P6.5, P6.6) as major deficiencies requiring immediate corrective action
  • Score 2: Not fulfilled — systematic failure, high risk; corrective action with accelerated timeline required before next delivery
  • Score 0: No evidence / not implemented — blocking; re-audit required before SOP release (if P1 applicable)

Closing meeting:

  • Present scores and degree of fulfillment per element
  • Confirm overall rating (A, B, or C)
  • Agree on corrective action deadlines (typically 90 days for B-rating findings; accelerated for score-2 and score-4 findings)
  • For B rating: schedule a follow-up audit or evidence review within 3 months to verify corrective actions are implemented — do not close the audit without this commitment in writing
  • Confirm re-audit requirements if applicable (mandatory for C rating)

Step 6 — Audit report structure

The VDA 6.3 report must contain:

  1. Audit information: date, location, auditor, auditee, scope
  2. Degree of fulfillment per element (P1–P7 as applicable)
  3. Overall rating (A, B, C)
  4. Finding list: for each score ≤ 6 — question, observation, evidence, score, deadline
  5. Positive findings: best practices worth noting
  6. Corrective action plan (CAP): supplier-signed, with root cause and due date per finding
  7. Re-audit requirement if C rating

Validation criteria

A VDA 6.3 audit is complete when:

  • All applicable elements (P5, P6, P7 minimum for series) have been scored
  • All findings (score ≤ 6) are documented with evidence
  • Degree of fulfillment calculated and overall rating stated
  • Corrective action plan signed by supplier quality management
  • Re-audit scheduled if rating is C

Common mistakes

  • Auditor accepts verbal confirmation as evidence — always request the record
  • Skipping the process walk and only reviewing documents — P6 requires observation of the live process
  • Not documenting positive evidence — the report must balance findings and strengths
  • Calculating degree of fulfillment without applying question weights
  • Not confirming error-proofing device checks are being performed at the required frequency
  • Closing meeting without confirming the corrective action deadline in writing
  • Rating B without scheduling a follow-up to verify corrective actions are implemented

Output Format

At the start of each use, ask the user:

"How would you like to receive the output? A — Structured Markdown (formatted tables and sections, ready to copy) B — Plain tables (simplified structure for Excel or Word) C — Narrative report (flowing text for a formal document or email)

Default: A."

Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.

Changelog

VersionDateAuthorChange
1.02026-06-06@RBraga01Initial release
1.12026-06-06@migmccExpanded weighting system explanation in Step 3; added auditor qualification and independence requirements; improved findings classification (score 4 vs 6 distinction); added B-rating follow-up timeline

Signals

GitHub stars
1k
Forks
316
Last commit
Oct 2026
Advanced
Item type
skill
Key
vda-6-3-audit
Source
github.com/hashgraph-online/awesome-codex-plugins