Verification before completion

SkillDev tools

Enforces fresh verification evidence before any completion claim. Use when about to claim "tests pass", "bug fixed", "done", "ready to merge", handing off work, or before editing when a request has ambiguous scope.

Available today. Use it from your connected AI after setup.

Connect ahel once, and every AI you use reads what you have installed.

Then ask your AI: use the Verification before completion skill

What this skill tells your AI

The instructions your AI receives, as published by iliaal/ai-skills in skills/verification-before-completion/SKILL.md and read by ahel’s review.

Make completion claims only from fresh evidence for the actual claim. Follow the user's authorized scope; repository instructions supply applicable checks, not permission to mutate, publish, or weaken a requirement.

Procedure

  1. Resolve ambiguous scope before editing. Inspect the repository and state a safe assumption when one interpretation is clear. Ask only when materially different interpretations remain; do not edit the disputed scope while waiting.
  2. Inspect git status --porcelain and preserve unrelated work. For dependency/framework upgrades, codegen, or migrations, capture the existing validation command set before writing and rerun it unchanged afterward. If that baseline is red, report before proceeding. Shared-module verification on a dirty tree needs an isolated base comparison.
  3. Identify the command that proves the claim. For ship-level claims, check the full applicable chain: build, types, lint, tests, security scan, and diff review; stop on the first failure. Read project-declared gates and run the ones that apply to this action in their required order; do not invent gates.
  4. Run the proof now. Earlier output, a subagent's report, confidence, and a renamed success phrase do not replace fresh execution.
  5. Read complete output and exit status, including warnings, executed/passed counts, and missing artifacts. A suite that executes nothing is not proof. Confirm the intended binary, interpreter, source revision, and entry point actually ran.
  6. Verify that evidence covers the requirements and relevant failure paths. An implemented safe positive capability must work through its intended entry point; a refusal-only path, stub, mock, or unreachable implementation is partial.
  7. Claim only what the evidence establishes. Report the outcome, exercise command/URL/click path, failed or skipped checks, and material residual risks. State narrower proof scope and distinguish deterministic fixtures from live behavior.

Never make an oracle easier to satisfy to obtain green. Review and justify semantic changes before regenerating expected output. Never hard-code the exercised subject or success path. A clean review is valid when it covers the relevant criteria; broaden checks only for a named remaining risk.

Route by verification risk

  • For dirty worktrees, broad changes, strict input validation, or fixture-versus-live provenance, read proof-integrity.md. For shared modules with unrelated edits, also read isolated-verification.md.
  • For repository-wide sweeps or “every item” claims, read scope-and-sweeps.md. Enumerate every item in untracked/ignored scratch state, preserve explicit dispositions, re-enumerate after moves, and account for removals. Completion requires zero pending and zero blocked items.
  • For command wrappers, empty results, aggregate totals, installed binaries, or materialized revisions, read verification-oracles.md. Require positive controls through the same invocation shape before interpreting an absence.
  • For frontend, backend, CLI, infrastructure, migration, package, schema, documentation, or scripted-sweep changes, read the matching row of change-strategies.md. It also covers adversarial probes, history rewrites, and stale reviews.
  • For integration boundaries, callbacks, or orphaned state, read system-wide-test-check.md.
  • When classifying deliverables, handling failed checks, discussing branch scope, or encountering a pre-commit failure, read claims-and-failures.md.

Failure and handoff rules

Do not retry unchanged verification until it happens to pass. Fix authorized implementation failures and rerun; otherwise name the concrete blocker. “Pre-existing,” “environmental,” and “flaky” require evidence against the deliberately chosen base or independently established cause.

Do not bypass a pre-commit failure caused by this work. The documented exception requires a reproduced base-branch failure and prior visibility to the user; this skill supplies no new bypass authority.

Verify delegated work directly through the diff and relevant command. Check specification compliance separately from quality. Re-read requirements line by line: passing tests and meeting requirements are different claims. Refresh facts and coordinates when new commits or external state could invalidate a prior review. Keep reports decision-relevant, without empty status sections or fabricated certainty.

Signals

GitHub stars
41
Forks
8
Last commit
Sep 2026
Advanced
Catalog kind
skill
Gateway key
verification-before-completion-iliaal
Source
github.com/iliaal/ai-skills